LARGE LIFT STATIONS
consulting_resources_010118a002004.jpg consulting_resources_010118a002003.jpg
ABOUT US
consulting_resources_010118a002004.jpg consulting_resources_010118a002003.jpg
SMALL LIFT
STATIONS
consulting_resources_010118a002004.jpg consulting_resources_010118a002003.jpg
MACHINE
CONTROL
consulting_resources_010118a002004.jpg consulting_resources_010118a002003.jpg
DOCUMENTATION SERVICES
consulting_resources_010118a002004.jpg consulting_resources_010118a002003.jpg
CONTACT US
consulting_resources_010118a002004.jpg consulting_resources_010118a002003.jpg
TECHNICAL AND
LINKS
consulting_resources_010118a002004.jpg consulting_resources_010118a002003.jpg
MAIN
Input 480 VAC - 40 amps
Output (2) 20 HP pumps
Duplex operations
This system was deigned for a large oil and gas company. It was located in a truck cargo container and controlled various pumps, mixers, lighting and environmental controls. Tested in very low temperature conditions in Wiliston ND.
Explosion proof - Mobile pump station
Input 480 VAC - 200 amps
Output (2) 25 HP pumps
Duplex operation
This system was deigned for a municipality.
It used two 25 HP Schneider VDFs with automatic float operation and a phone dialer that called the moniting company if VFD, phase, seal leak or level faults ocurred.
City of Chapin - Lift station